Philadelphia Court House
Couthouse Building
CM3 successfully delivered comprehensive building management solutions for the Philadelphia Family Court, a 510,000 square foot, 14-story courthouse completed in 2015. The facility is equipped with a Building Management System (BMS) featuring 4,000 hardwired I/O points and a native BACnet architecture. CM3’s scope included direct control and monitoring of HVAC systems, encompassing 36 air handling units and 560 VAV boxes, as well as electrical equipment and airflow monitoring systems.
We implemented integrated solutions for critical systems such as smoke evacuation, garage exhaust ventilation, and interfaces with chillers and electrical switchgear systems—ensuring high-performance operations and long-term reliability for this vital civic facility.
Building Services
-
Construction Completed 2015
-
510,000 Square Feet, 14 Floors
-
4,000 Hardwired I/O to BMS
-
Native BACnet Solution

Building Management System
Directly Controlling/Monitoring System
-
HVAC Equipment
-
Electrical Equipment Monitoring
-
Air flow Monitoring Equipment
-
36 Air Handlers
-
560 VAV boxes
-
Smoke Evacuation System
-
Garage Exhaust Ventilation System
Interface With
-
Chillers
-
Electrical Switchgear Systems